Analyze Accounts to Separate Mixed Costs into Variable and Fixed Components
How to Prepare a Break-Even Analysis with More Than One Product
Activity-Based Costing for Overhead Allocation

Theoretical and Practical Capacity in Cost Accounting

In cost accounting, capacity refers to how much you can do, based on the assets (equipment, machinery, vehicles, and so forth) you have. In business, determining your true capacity level is a balancing act. You want to avoid investing too much and then find that the capacity isn’t needed. The money you invest in unused production capacity could be better spent elsewhere.

On the other hand, you want to invest enough to fill every possible customer order. Your realistic capacity is somewhere in the middle. You want the ability to fill orders without biting off more than you can chew.

Two types of capacity focus on production: theoretical capacity and practical capacity. Consider how much you could produce if customer demand was unlimited. Select a capacity method that makes sense to you, and use that as a tool to plan production and spending.

Theoretical capacity assumes that nothing in your production ever goes wrong. Accountants describe this capacity as working at full efficiency all the time.

Consider what your pie-in-the-sky or perfect-world capacity would be. It’s a world in which everything runs perfectly and no machines or equipment ever break down. It’s utopia where no worker ever makes a mistake. That would be great, wouldn’t it? That’s theoretical capacity, and you can’t reach it. It seems silly, but you need to see this level of capacity to understand the others.

Say you own a business that makes athletic running shorts and other clothing. At maximum capacity, you can make 200 pairs of shorts per shift. You run three 8-hour shifts per day, 365 days a year. Based on those numbers, here is your theoretical capacity:

Theoretical capacity = shorts x shifts x 365 days
Theoretical capacity = 200 x 3 x 365 days
Theoretical capacity = 219,000

Unfortunately, this level of capacity isn’t attainable. You need to take into account the unavoidable. That gets you to practical capacity.

Practical capacity is the level of capacity that includes unavoidable operating interruptions. Another description is unavoidable losses of operating time. Consider maintenance on equipment, employee vacations, and holidays. You’re willing to accept a good, rather than perfect, capacity level.

The people in your company can help you determine your practical capacity. Your production and engineering staff can answer questions about machine capacity and repair time. Your human resources staff can forecast employee availability, based on vacations and holidays.

You determine that 250 days is a more realistic number of production days, given unavoidable operating interruptions. Also, you decide that two shifts per day are realistic. Here’s the practical capacity calculation:

Practical capacity = shorts x shifts x days
Practical capacity = 200 x 2 x 250
Practical capacity = 100,000

The practical capacity is 100,000 units (pairs of shorts) per year.

blog comments powered by Disqus
A Collection of Images from Getting the Most Out of Xero In A Day For Dummies
An Example of Accounting for the Job Order Costing System
A Collection of Images from Converting to Xero from MYOB In A Day For Dummies
Scattergraph to Separate Mixed Costs into Variable and Fixed Components
Managerial Accounting: Types of Responsibility Centers
Advertisement

Inside Dummies.com