How the Election Process Works in the United Kingdom
How British Parliament Actually Works
How Congress Controls the Budget in Washington, D.C.

Excusing Contract Performance Due to Impracticability

When an unforeseen event makes performance of a contract obligation impracticable (impossible or unrealistic), the seller may claim that its nonperformance is excused. To analyze a claim of impracticability, determine whether all of the following apply:

  • The event occurred after the contract was made.

  • Performance became impracticable because of the event.

  • The nonoccurrence of the event was a basic assumption of the contract.

  • The party seeking to be discharged carried the risk of the event’s occurring.

  • Add a Comment
  • Print
  • Share
blog comments powered by Disqus
What Is Gerrymandering?
Washington, D.C., History: Changing Population Demographics
U.S. Constitution For Dummies Cheat Sheet
Washington, D.C., during the Roosevelt Years
Contract Law For Dummies Cheat Sheet
Advertisement

Inside Dummies.com